Motivation - Current situation of HPC
High Performance Computing (HPC) systems are crucial resources for research and development | |
Users want to focus on their science rather than becoming HPC specialists | |
Operation of HPC systems requires specialised centres | |
European HPC centres offer a variety of HPC architectures from different vendors with frequent innovation | |
European HPC centres and users are
connected by high-bandwidth networks |
|
Build a European Grid infrastructure | |
that gives users | |
a seamless, secure access to | |
High Performance Computing resources | |
and that advances computational science | |
in Europe |
Support the e-Science concept | |
Integrate resources of leading European HPC centres into a European HPC GRID | |
Develop new software components for GRID computing | |
Demonstrate the ASP model for HPC access (‘HPC portal‘) |
HPC Centres | |
SCSC Manno (CH) | |
FZ Jülich (D) | |
ICM Warsaw (PL) | |
IDRIS Paris (F) | |
Univ Bergen (N) | |
Univ Manchester (UK) | |
Users | |
Deutscher Wetterdienst | |
EADS | |
debis Systemhaus (Assistant Partner) |
Application GRIDS: application-specific interfaces, evaluation of GRID solutions |
||
Bio-GRID | ||
Meteo-GRID | ||
CAE-GRID | ||
HPC GRID Infrastructure: connect HPC centres using UNICORE technology |
||
Development and integration of new components | ||
Dissemination and exploitation |
Operate a GRID for biomolecular simulations |
|
Develop interfaces to existing
biological and chemical codes |
|
Develop a relocatable version of DWD‘s weather prediction model | |
Goal: weather prediction on-demand as an ASP solution |
Coupled simulation of aircrafts (e.g.
structural mechanics and electromagnetic compatibility) |
|
Goal: internal HPC portal for EADS engineers |
Provide HPC portal to engineers at Daimler-Chrysler and partners | |
Develop GRID technology for computing cost estimates and billing |
|
EUROGRID Infrastructure and Components
Based on UNICORE system | ||
Develop additional GRID components | ||
efficient data transfer | ||
ASP infrastructure | ||
resource broker | ||
application coupling | ||
interactive access | ||
Integration of new components by Pallas and Fecit | ||
EUROGRID-0 has been installed by partners | |
HPC-Grid is running | |
Development of application specific user interfaces begun | |
UNICORE test system is available (www.fz-juelich.de/unicore-test) |
|
Joint workshop with DataGrid planned for GGF3 | |
EUROGRID booth at SC2001 in Denver | |
GRIP project about UNICORE – Globus interoperability proposed and positively evaluated |